TCH Rack and stack in action : Michigan Colocation Edition

TCH-BLOGGeneral, Michigan Colocation, TCH Blog Forum Leave a Comment

At TotalChoice Hosting, colocation isn’t just about renting space. It’s about delivering a premium, hands-on experience from the moment you place your order — and this Dell PowerEdge R440 is a perfect example.

Step 1: The Web Order
This journey started like many others—with a client ordering our 1U colocation package directly from the TotalChoice Hosting website. As soon as the order was placed, our sales team reached out personally to finalize the details:

  • Sent client a guide on Michigan Colocation Rack and Stack
  • Provided the client’s dedicated IPv4 allocation
  • Confirmed technical specs (power, uplinks, IPMI, etc.)
  • Asked if the server would be shipped or hand-delivered

Step 2: Arrival via Client-Managed Shipping

The client chose to ship the server directly to our Michigan data center and took advantage of our White Glove Receiving & Rack Service.

While the client is responsible for arranging shipping, we provide clear guidance on packaging and delivery requirements:

  • Use proper OEM-grade or better protective materials
  • Include asset details inside the box
  • Ensure signature-required delivery to our facility
  • Send tracking info to our support team

Once the Dell PowerEdge R440 landed at our loading dock, our technicians took over — unboxing, inspecting, and preparing it for rack deployment.

Step 3: Honeymoon Service Begins

All new colocation clients enjoy our 30-Day Honeymoon ServiceGold-Level Smart Hands, completely free during the first month.

That includes:

  • Free rack & stack
  • Free cabling, power setup, and uplink testing
  • Remote KVM/IPMI configuration
  • Real-time setup assistance

After the Honeymoon period, clients can choose from four Smart Hands service levels to fit their ongoing needs — from basic tasks to full technical management.

Step 4: Inspection

After arrival, our techs performed a full intake inspection:

  • Verified hardware integrity (PSU, fans, RAM, drive trays)
  • Patched into our staging VLAN to confirm network behavior
  • Verify successful POST (Power on Self Test) and clean boot.

Everything passed — the R440 was clean and stable and ready to rack.

Step 5: Rack, Stack & Connect

We mounted the server in Cabinet 19 – Slot 04, connected to dual redundant 120V PDUs, and patched it into our monitored blended bandwidth network on a fully monitored 1Gbps unmetered connection.

  • Dual power feeds tested
  • Neatly dressed and labeled cabling
  • IPMI and KVM confirmed operational
  • Switch port and MAC verified
  • Logged into our internal DCIM inventory and added an inventory asset tag.

Step 6: Client Handoff

We sent the client:

  • High-res photos of the rack installation
  • IP and reverse DNS confirmations
  • Uplink port info
  • onboarding verification
  • Access instructions and Smart Hands contact info

All of it — zero hassle, no delays.

Why It Matters

This is how we do colocation at TotalChoice Hosting:

  • Clear communication
  • Free expert onboarding
  • Hands-on hardware care
  • Real transparency

When your business depends on your server, we treat it like it’s ours.

Want colocation done right?

1U, 2U, half rack, or full cabinet space available
Don’t delay, order today! Colocation Services
Smart Hands Service Options

Leave a Reply

Your email address will not be published. Required fields are marked *